Monday, June 20, 2011

Top deck Under Preparation




3 Saturdays it took to Prepair the top deck and most of that work was stripping the old paint from the ceiling as that took 2 Saturdays to do and sanding on the walls took up most of the day. Next up i will be working on the walls in the Staircase as sanding will take place when iam working on this bus next time. Also the Bottom deck will start being worked on also.




The floor on the near side is awaiting repair and will be done in coming months and same goes for painting that will take place around the spring or Summer time when it warms up as this time of year is the worst time for painting as its too cold for this time of year.



Monday, June 13, 2011

Its Current State







Here is Leyland Atlantean 1215 in its current Condition and i will be restoring it into its Original condition to what it was when it was in Service with the Public transport Commission back in the 1970s.


Alot of work is involved in this vehicle as at the moment iam taking old paint and doing other repairs to it and also planned to paint the whole Interior and the Outside of this Bus.



This Bus was new to now closed Pagewood deopt in 1973 and served the areas around the Eastern Suburbs. This bus was one of the buses that had caught fire at Pagewood depot in April 1974 and was rebuilt by Apprentinces at Chullora Workshops between 1976 and 1977. It was next to Other Atlantean 1219 which was destoryed by the Fire and was withdrawn at only 13 months old.






Here is the Interior when the Restoration began, the Ceiling is now scraped and will be repainted and the same goes for the walls and which will be sanded back and prepaired for painting.



The Floor on the nearside will be repaired due to wood rot as was hosed by Previous owner that had it and seat frames will be removed to begin the repairs and will be removed for the painting that wont take place for a few months as we are now in the colder months.